Master Plan

This section of the Airport Master Plan website contains material provided and presented to the Planning Advisory Committee (PAC).  The PAC is a volunteer group that has been selected by the consultant to represent a broad constituency of airport stakeholders and to provide input and feedback during the development of the Airport Master Plan.  The PAC includes representatives from FAA, the California Department of Transportation (Caltrans), airport businesses, tenants, area economic development interests, neighborhood associations, area city governments, and local citizen interest groups.  The PAC has been limited to 25 members to help facilitate detailed discussion and exchange of ideas.

Material to be posted includes draft chapters of the Airport Master Plan, Power Point presentations, and handouts.

Master Plan Process Handout – view

MRYCover

Cover, Table of Contents   view

Introduction

view

Chapter One: Inventory

Part One view

Part Two  view

Chapter Two: Forecasts

view

Chapter Three: Demand/Capacity Analysis

view

Chapter Four: Facility Requirements

view

Chapter Five: Airport Development Alternatives

Part One –   view
Part Two –   view

Chapter Six: Recommended Development Alternative

view

Exhibit 6A: Recommended Development Alternative (Revised) – view

Exhibit 6D: Terminal Area Detail (Revised) – view

Chapter Seven: Capital Improvement Plan

view

Appendix A: Glossary of Terms

view

Appendix B: Environmental Overview

view

Appendix C: FAA Forecast Approval Letter

view

 Appendix D: Sustainability Plan

view

Appendix E: FAA Taxiway Separation Waiver

view

Appendix F: Land Use Compatibility Analysis

Part One – view
Part Two – view

Appendix G: Economic Benefit Analysis

view

Appendix H: Airport Layout Plans

view

Errata for the Draft Final Airport Master Plan

Part One:  view
Part Two:  view
Part Three:  view